System and method for recovering waste heat

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10662823
APP PUB NO 20150275701A1
SERIAL NO

14430796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system having a combustion engine with a Rankine bottoming cycle, the system including a first flow path for a process fluid and a second flow path for a working fluid, and a heat exchanger arranged along both the first and the second flow paths to transfer waste heat from the process fluid to the working fluid. The heat exchanger includes a first flow conduit being bounded by a first wall section and configured to convey the process fluid, a second flow conduit to convey the working fluid, the second flow conduit being bounded by a second wall section spaced apart from the first wall section to define a gap therebetween, and a thermally conductive structure arranged within the gap and joined to the first and second wall sections to transfer heat therebetween, the gap being fluidly isolated from both the process fluid and the working fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MODINE MANUFACTURING COMPANY1500 DEKOVEN AVENUE RACINE WI 53403

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ernst, Timothy C Columbus, US 49 757
Hughes, Gregory Gerald Milwaukee, US 2 4
Nelson, Christopher Columbus, US 56 557
Reinke, Michael J Franklin, US 40 951
Rousseau, Tony Racine, US 9 79
Zigan, James Versailles, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00