Integration of non-woody biorefining at pulp and paper plants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9856605
SERIAL NO

14673811

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some variations, a process is provided for producing a pulp product at a biorefinery site, comprising: converting a woody cellulosic material to a first pulp stream; converting a non-woody cellulosic material to a second pulp stream; blending the second pulp stream into the first pulp stream; and recovering or further processing the blended pulp stream as a pulp product. Biorefinery site infrastructure may be shared between the woody and non-woody lines. Also, the process may include process integration of mass and/or energy between the woody and non-woody lines. The process may be a retrofit addition to a pulp plant, or a greenfield biorefinery site. The non-woody line also can generate fermentable sugars, for fermentation to ethanol (or other products). Through allocation of carbon credits from the ethanol to the pulp, the final pulp product life-cycle profile can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRANBIO INTELLECTUAL PROPERTY HOLDINGS LLC300 MCINTOSH PARKWAY IP DEPT THOMASTON GA 30286

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Retsina, Theodora Atlanta, US 156 843

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00