Oil passage structure for internal combustion engine
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jun 13, 2017
Grant Date -
Sep 24, 2015
app pub date -
Oct 25, 2013
filing date -
Oct 29, 2012
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
Cover (25) is mounted on wall surface (12) on the front side of cylinder block (10). Sub gallery (26) through which engine oil flows is formed between cover (25) and wall surface (12). Chain tensioner (17) is mounted on cover (25), and the engine oil in sub gallery (26) is supplied to chain tensioner (17) through oil supply port (31) formed through cover (25).
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
NISSAN MOTOR CO LTD | 2 TAKARA-CHO KANAGAWA-KU YOKOHAMA-SHI KANAGAWA 221-0023 |
International Classification(s)

- 2013 Application Filing Year
- F01M Class
- 209 Applications Filed
- 188 Patents Issued To-Date
- 89.96 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Mochida, Hiroaki | Kawasaki, JP | 7 | 19 |
# of filed Patents : 7 Total Citations : 19 | |||
Tooyama, Hideaki | Yokohama, JP | 2 | 13 |
# of filed Patents : 2 Total Citations : 13 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F01M Class
- 0 % this patent is cited more than
- 8 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 13, 2024 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 13, 2028 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
