System for powered ankle-foot prosthesis with active control of dorsiflexion-plantarflexion and inversion-eversion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9849003
SERIAL NO

14663130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for operating a prosthesis is provided. The system includes a socket configured to engage a residual limb of a subject and a shaft having a first end connected to the socket and an opposing second end. The system also includes a foot piece connected to the second end of the shaft. The foot piece includes an ankle plate and a sole piece configured to contact a surface. The system also includes at least one computer configured to detect a state of the foot piece and to transmit an indication of the state of the foot. The system further includes a motor assembly configured to receive the indication of the state of the foot and to control a position and impedance of the ankle plate based on the state of the foot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAYO FOUNDATION FOR MEDICAL EDUCATION AND RESEARCH200 FIRST STREET SW ROCHESTER MN 55905

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ficanha, Evandro Houghton, US 1 5
Kaufman, Kenton Rochester, US 3 158
Rastgaar, Mo Houghton, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00