Mixing stage, modulator circuit and a current control circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9673845
SERIAL NO

14710764

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixing stage includes a first modulation stage that receives an input signal from a first common node of the mixing stage, a first local oscillator input that receives a local oscillator signal, and a first modulation signal output adapted to provide a first modulated signal. A second modulation stage of the mixing stage includes a second input that receives a phase inverted representation of the input signal from a second common node of the mixing stage, a second local oscillator input that receives the local oscillator signal, and a second modulation signal output adapted to provide a second modulated signal. A current generation circuit provides a supply current to the first common node and to the second common node. A current control circuit is adapted to superimpose an offset current to the current of at least one node of the first common node and the second common node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINEON TECHNOLOGIES AGAM CAMPEON 1-12 NEUBIBERG 85579

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knapp, Herbert Munich, DE 27 216
Trotta, Saverio Munich, DE 110 1018

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00