Output changing method for an A/D conversion apparatus and A/D conversion apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9276600
APP PUB NO 20150249461A1
SERIAL NO

14635513

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An output changing method of an A/D conversion apparatus is provided. The apparatus includes a pulse delay circuit in which delay units are connected in series, and an encoding circuit which detects the number of stages of the delay units, through which a pulse signal passes during predetermined measurement time, and generates numeric data corresponding to the number of stages. The apparatus receives an analog input signal as power supply voltage of the pulse delay circuit to perform A/D conversion for the analog input signal. The method includes determining whether or not the analog input signal is within an allowable voltage range in which the apparatus operates normally, outputting the numeric data as an A/D conversion value if the analog input signal is within the range, and outputting numeric data formed of a specified value as the A/D conversion value if the analog input signal is not within the range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Terazawa, Tomohito Yokohama, JP 24 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00