On chip characterization of timing parameters for memory ports

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9570195
APP PUB NO 20150248925A1
SERIAL NO

14635204

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit and method for memory characterization. The circuit includes first and second programmable delay lines, address and data registers, an output register and a finite state machine controller. The finite state machine controller supplies an address to the address register, data to the data register and controlling a delay of the first programmable delay line and the second programmable delay line in at least one predetermined sequence to determine an operating characteristic of the memory to be tested. The programmable delay lines may be connected as a ring oscillator. Determination of the frequency of the ring oscillator via a counter determines the delay of the delay line. The programmable delay lines, the address register and data registers, the output register, the finite state machine controller and the memory to be tested are preferably constructed on a same semiconductor substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED13500 NORTH CENTRAL EXPRESSWAY DALLAS TEXAS 75265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kashyap, Abhijith Ramesh Bangalore, IN 9 291
Pundoor, Shrikrishna Bangalore, IN 2 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 14, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00