Injection valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9546630
APP PUB NO 20150247479A1
SERIAL NO

14429466

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An injection valve for injecting fuel into a combustion chamber includes: a housing having at least one spray discharge orifice on a discharge side; a solenoid coil; a magnet armature linearly movable by the solenoid coil; a valve needle for opening and closing the spray discharge orifice, which valve needle projects through the magnet armature and is linearly movable along a longitudinal axis, the magnet armature being linearly movable in relation to the valve needle between a first stop and a second stop, the second stop being formed by a stop element having a stop face and a counter element having a counter face situated opposite the stop face, the stop element having an elastic design so that an angle between the longitudinal axis and the stop face is changed when the counter face strikes the stop face.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBH70442 STUTTGART

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berg, Anselm Ludwigsburg, DE 10 36
Graner, Juergen Sersheim, DE 25 203
Maeurer, Walter Korntal-Muenchingen, DE 10 39
Moser, Friedrich Magstadt, DE 34 91
Rogler, Philipp Stuttgart, DE 26 62
Schoenrock, Olaf Stuttgart-Weilimdorf, DE 15 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00