Downhole power delivery tool powered by hydrostatic pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9194210
APP PUB NO 20150247377A1
SERIAL NO

14368047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Certain aspects are directed to downhole power delivery tools using hydrostatic pressure within the wellbore. In one aspect, a downhole power delivery tool is provided that can be disposed in a wellbore through a fluid-producing formation. The downhole power delivery tool includes a body defining an inlet proximate to a chamber in the body, an actuation mechanism in the body and adjacent to the inlet, and a piston proximate to the chamber. The actuation mechanism can allow communication of hydrostatic pressure via the inlet to the chamber from an annulus external to the body in response to an actuation force being applied to the actuation mechanism. The hydrostatic pressure communicated to the chamber applies a first force to the piston. The piston applies a second force to a rod movable relative to the body in response to the first force being applied to the piston.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC10200 BELLAIRE BLVD HOUSTON TX 77072

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Williamson,, Jr Jimmie Robert Carrollton, US 14 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00