Apparatus for and method of controlling power window by using output current of motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9822573
APP PUB NO 20150247351A1
SERIAL NO

14630282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus and method of controlling a power window by using an output current of a driving motor. The output current is measured to calculate and store a current reduction time, and then, execution of a safety function is delayed when an interruption in ascending of the window glass is sensed, so that interruption caused by noise generated when a car moves over an unpaved road or road bumps may be distinguished from interruption caused by an actual obstacle. Then, the safety function is prevented from being executed if the interruption in the ascending of the window glass is caused by the noise. Therefore, the interruption of the ascending of window glass due to the noise generated when the car moves on the unpaved road or road bumps may be distinguished without using an additional sensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DY AUTO CORPORATION48-23 DOGOMYEON-RO DOGO-MYEON ASAN-SI 31550

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Eui Cheol Gwangmueong-si, KR 1 1
Son, Dong Hun Pohang-si, KR 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00