Spin bath and method for consolidation of a shaped article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10208402
APP PUB NO 20150247261A1
SERIAL NO

14434625

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coagulation bath is provided with a coagulation liquid inlet, wherein the coagulation liquid inlet has one or more mouths, which are arranged beneath the coagulation liquid level of the coagulation bath; in particular a spinning bath system with a coagulation liquid inlet and an entry region for spinning yarns which are solidified in the spinning bath, wherein the entry region is provided at a position in which, when the spinning bath is filled with coagulation liquid, the liquid surface is the surface of the coagulation liquid, the coagulation liquid inlet has one or more mouths arranged beneath the entry region and are directed to spinning yarns introduced into the spinning bath such that fresh coagulation liquid flows against the spinning yarns during operation, and optionally a liquid fill level regulator and possibly further tanks with different coagulation liquid composition and methods for spinning yarns in a spinning bath.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AUROTEC GMBH4844 REGAU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ecker, Friedrich Timelkam, AT 45 310
Zikeli, Stefan Regau, AT 72 645

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 19, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 19, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00