Substrate holder, plating apparatus, and plating method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10316425
APP PUB NO 20150247253A1
SERIAL NO

14634647

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A substrate holder according to the present invention comprises a first power supply member and a second power supply member which allow power to be supplied to substrates having different properties. The first power supply member comprises a first power supply member end part which extends toward the inside of a substrate holding surface and is disposed at a first position of the substrate holding surface. The second power supply member comprises a second power supply member end part which extends toward the inside of the substrate holding surface and is disposed at a second position of the substrate holding surface. The first position is located on the center side of the substrate holding surface relative to the second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EBARA CORPORATIONTOKYO 144-8510

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Masaaki Tokyo, JP 63 812
Yahagi, Mitsutoshi Tokyo, JP 25 131
Yajima, Toshikazu Tokyo, JP 6 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00