Cement clinker production system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9868666
SERIAL NO

14367494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The cement clinker production system includes: a first supplying section configured to supply a sulfur source and a fluorine source of mineralizer; a second supplying device configured to supply clinker raw material; a crusher configured to crush the mixed raw material obtained by mixing the clinker raw material with the fluorine source of the mineralizer; a kiln configured to burn the crushed mixed raw material; an introducing section configured to introduce the sulfur source of the mineralizer to the kiln; a third supplying section configured to supply fuel to the kiln; and a test sample-analyzing system configured to collect each of the mixed raw material before the burning and the clinker after the burning and to measure amounts of the fluorine, main components and free lime depending on the type collected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI MATERIALS CORPORATION3-2 OTEMACHI 1-CHOME CHIYODA-KU TOKYO 100-8117

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ichihara, Katsuhiko Miyako-gun, JP 3 10
Sakamoto, Kazuo Chichibu-gun, JP 78 763
Tabata, Kazuo Chichibu-gun, JP 1 2
Tanaka, Hisanobu Chichibu-gun, JP 14 170
Tanaka, Yukio Tokyo, JP 210 3184
Yamashita, Makio Chichibu-gun, JP 6 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00