Axle assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9376160
APP PUB NO 20150246706A1
SERIAL NO

14521208

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An axle assembly for a bicycle is disclosed. The axle assembly is configured to be installed at a mounting structure on the bicycle to mount a rotating hub of a wheel on the bicycle. The axle is secured to the mounting structure by a bolt; the bolt is nested in a retainer secured to the mounting structure. The axle has at least one non-circular section engaging a corresponding non-circular section of the mounting structure. The retainer is installed in a threaded section of the mounting structure. At initial installation of the axle assembly the retainer and the bolt of the axle assembly are installed on the mounting structure; subsequent installation and removal of the wheel/hub is accomplished by installation and removal of the axle performed by rotation of the bolt (using a tool or a tool-free feature) nested in the retainer. The axle assembly can be installed in the front fork (such as a front suspension fork) or the rear frame of the bicycle or other wheeled vehicle. The axle assembly comprises one or more of the inventive concepts and features shown and described in the specification and FIGURES.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HAYES BICYCLE GROUP, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pye, Nicholas William Carrboro, US 5 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00