Hanger wires for contact wires of railway electrical lines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10807500
APP PUB NO 20150246623A1
SERIAL NO

14427594

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hanger wire for contact wires of railway electrical lines may include: first wires including copper or a first alloy of copper; and second wires including a steel core coupled with a layer of copper or a second alloy of copper. An overhead contact line suitable to transmit electric power to a locomotive may include: at least one conductor element connected to a high voltage electric energy distribution network; at least one suspension wire fastened to a series of supporting poles arranged along the overhead contact line; and a plurality of hanger wires connecting the at least one conductor element to the at least one suspension wire. The hanger wires may include: first wires including copper or a first alloy of copper; and second wires including a steel core coupled with a layer of copper or a second alloy of copper.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COPPERWELD BIMETALLICS LLC5141 VIRGINIA WAY SUITE 410 BRENTWOOD TN 37027

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fox, Dustin Brentwood, US 2 2
Peruzzotti, Franco Legnano, IT 26 457
Pezzoni, Antonio Cerro Maggiore, IT 1 2
Syarif, Yance Brentwood, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00