Linear accelerator system with stable interleaved and intermittent pulsing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9661734
APP PUB NO 20150245462A1
SERIAL NO

14634361

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A linac-based X-ray system for cargo scanning and imaging applications uses linac design, RF power control, beam current control, and beam current pulse duration control to provide stable sequences of interleaved pulses having different energy levels, for example alternating 4 MeV and 6 MeV pulses or other energies where the difference in levels is at least approximately 1 MeV and less than approximately 5 MeV. The pulse repetition rate can be 100-400 pulses per second or more. In an embodiment, a cool down calculation is combined with automatic frequency control to provide stable energy and dose per pulse even upon restarting of pulsing after an “off” period of indeterminate duration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMERICA BANKPO BOX 75000 MAIL CODE 7578 DETROIT MI 48275

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Henderlong, Devin Kirk Boulder Creek, US 8 31
Korringa, Maarten Mountain View, US 10 35
Nighan,, Jr William L Portola Valley, US 10 35
Rolin, John Howard Morgan Hill, US 15 530

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00