WSON restoration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9559770
APP PUB NO 20150244453A1
SERIAL NO

14344973

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Dynamic restoration involves routing and bandwidth assignment of an unplanned restoration path in a wavelength switched optical network (20), having regeneration nodes (60), nodes each having a ROADM (62) having drop paths and add paths. An electrical switch (68) provides configurable regeneration capacity by coupling selected drop paths to selected add paths. Some of the configurable regeneration capacity is kept for unplanned restoration paths. A PCE determines (120) routing and bandwidth assignments for an unplanned restoration path for the traffic flow to avoid a fault, and sends (130) configuration messages to the nodes to set up the unplanned restoration path dynamically and to configure the electrical switch to provide regeneration on the path. Keeping some reconfigurable regeneration capacity enables much longer unplanned paths to be found to avoid faults, and enables wavelength conversion if needed. Thus the reliability of finding at least one path avoiding the fault can be increased.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET L M ERICSSON (PUBL)S-164 83 STOCKHOLM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bottari, Giulio Leghorn, IT 73 552
Caviglia, Diego Savona, IT 53 417
Ceccarelli, Daniele Genoa, IT 67 352

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00