Load center and switchgear mounting assembly therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9166383
APP PUB NO 20150244153A1
SERIAL NO

14189285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switchgear mounting assembly for a load center includes a base assembly, an electrical bus assembly, and a bracket. The base assembly includes a base and a central protrusion extending outwardly from the base. Bus bars are electrically connected and mechanically coupled to the central protrusion and include stabs, which extend radially outwardly from the central protrusion. The bracket is coupled to the central protrusion and includes supporting elements. Each supporting element maintains a corresponding electrical switching apparatus in electrical communication with a corresponding one of the stabs. The switchgear mounting assembly is therefore structured to mount the electrical switching apparatus in a radial array extending around the central protrusion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EATON INTELLIGENT POWER LIMITEDD04 Y0C2 DUBLIN 4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Jesus Reyes Glennys Johanny San Cristobal, DO 3 8
Jimenez, Gonzalez Sandy Omar Monaca, US 11 16
Mazara, Diaz Hoyma Joel Distrito Nacional, DO 2 8
Nunez, Hernandez Mario Santo Domingo Oeste, DO 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 20, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00