Water-cooled reactor system for generating electricity

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10079077
APP PUB NO 20150243386A1
SERIAL NO

14633811

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear reactor system for generating electricity includes a nuclear reactor that uses water as a coolant and a moderator, and generates thermal energy through nuclear fission. The reactor includes a reactor vessel and a reactor core. The reactor core comprises a plurality of fuel assemblies and one or more core baffles. In an embodiment the reactor core is square-shaped with a hollow center portion, and is concentric with the reactor vessel. The reactor permits decay-heat removal from the fuel assemblies in the absence of the coolant. A power conversion system is arranged to indirectly receive thermal energy generated by the reactor core and to generate electricity. A refueling water storage tank is useable when the reactor core is refueled with nuclear fuel. A containment surrounds the reactor vessel and the refueling water storage tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGYDAEJEON DAEJEON

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ho Sik Daejeon, KR 18 791
No, Hee Cheon Daejeon, KR 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00