Contingency-based load shedding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9519301
APP PUB NO 20150241894A1
SERIAL NO

14190858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are a variety of systems and methods for management of an electric power generation and distribution system. According to various embodiments, a system consistent with the present disclosure may be configured to analyze a data set comprising a plurality of generator performance characteristics of a generator at a plurality of operating conditions. The performance characteristics may be used to produce a generator capability model. The generator capability model may comprise a mathematical representation approximating the generator performance characteristics at the plurality of operating conditions. The system may further produce an estimated generator capacity at a modeled condition that is distinct from the generator performance characteristics of the data set and is based upon the generator capability model and may implement a control action based on the estimated generator capacity at the modeled condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHWEITZER ENGINEERING LABORATORIES INC2350 NE HOPKINS COURT PULLMAN WA 99163

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allen, William F Airdrie, CA 6 215
Bartlett, Jedidiah W Uniontown, US 4 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00