Saggar assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10054365
APP PUB NO 20150241126A1
SERIAL NO

14631104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly for providing a saggar for use in high temperature applications, may include a rectangular base element and first and second sets of two rectangular wall elements, wherein the rectangular base element includes connectors on two opposite sides for connecting with the two rectangular wall elements of the first set of the rectangular wall elements at the two opposite sides. The two rectangular wall elements of the first set may each include a connector at a first edge for connecting with the rectangular base element at the two opposite sides, and the two rectangular wall elements of the first set each may include two recesses in a second edge opposite to the first edge and in the vicinity of each end of the second edge of the rectangular wall elements of the first set. The two rectangular wall elements may each include two ears for connecting with the recesses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMERTECH SAS75015 PARIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kiss, Sandor Hodmezovasarhely, HU 4 44
Sonntag, Andreas Wasserburg am Inn, DE 7 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00