Combustion chamber wall and a method of manufacturing a combustion chamber wall

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10260749
APP PUB NO 20150241062A1
SERIAL NO

14608943

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustion chamber wall is hollow, has a first surface and a second surface and includes a plurality of polyhedron shaped chambers defined by a matrix of integral interconnected walls. The walls of the chambers in a first layer define the first surface of the combustion chamber wall and the walls of the chambers in a third layer define the second surface of the combustion chamber wall. The chambers are fluidly interconnected by apertures extending through the integral interconnected walls of the chambers for the flow of coolant there-between. The walls of the chambers in the first layer have apertures extending there-through to supply coolant into the first layer and the walls of the chambers in the third layer have apertures extending there-through to supply coolant from the third layer into the combustion chamber. The combustion chamber wall is manufactured by additive layer manufacture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROLLS-ROYCE PLCKINGS PLACE 90 YORK WAY LONDON N1 9FX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harding, Stephen Charles Bristol, GB 3 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00