Solid-fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9599335
APP PUB NO 20150241058A1
SERIAL NO

14421003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid-fuel burner includes: a venturi having a constricting portion where the transverse cross section of a fuel passage is reduced in a fuel nozzle for supplying a solid fuel; and a fuel concentrator for diverting the flow in the nozzle outward in the wake side of the venturi, and the nozzle is formed so that (a) the aperture in the vicinity of an opening portion of a boiler furnace wall surface has a flat shape, (b) cross-sectional shape thereof orthogonal to a nozzle center axis C on the outer peripheral wall of the nozzle is circular in a transverse cross section up to the constricting portion of the venturi, (c) a portion that has a gradually increasing degree of flatness is provided between the constricting portion and the opening portion, and (d) the flat shape in the opening portion is where the degree of flatness reaches a maximum.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kiyama, Kenji Hiroshima, JP 33 317
Kuramashi, Koji Hiroshima, JP 45 122
Mine, Toshihiko Hiroshima, JP 11 39
Ochi, Kenichi Hiroshima, JP 11 49
Ochi, Yusuke Hiroshima, JP 16 79
Ohyatsu, Noriyuki Hiroshima, JP 4 33
Okazaki, Hirofumi Ibaraki, JP 49 420
Shimogori, Miki Hiroshima, JP 8 73
Tadakuma, Satoshi Hiroshima, JP 8 19
Wakamatsu, Hitoshi Hiroshima, JP 2 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00