Electrically controlled pressure control valve for an adjustable hydrostatic pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10072654
APP PUB NO 20150240961A1
SERIAL NO

14625309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electroproportional pressure control valve of cartridge-type construction is screwed into a housing bore of a hydrostatic pump. The cartridge includes an adjusting pressure port, a pump port, and a tank port. The adjusting pressure port is relieved to the tank port in a normal position of a spring-biased valve plunger of the pressure control valve. A connection from the pump port to the adjusting pressure port is opened counter to the force of the spring by increasing a current of an electromagnet and increasing the pump pressure at the pump port. The spring, the electromagnet, and the resultant force of the pump pressure act along a common axis of movement of the valve plunger. A first nozzle connects the adjusting pressure port to an adjusting pressure chamber. A second nozzle connects the adjusting pressure port to the tank port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHPOSTFACH 30 02 20 STUTTGART 70442

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Diebold, Carola Eutingen, DE 10 23
Nordt, Friedemann Eutingen, DE 6 9
Offenburger, Johannes Dundee, GB 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00