Submersible power generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9506450
APP PUB NO 20150240778A1
SERIAL NO

14421176

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A submersible power generator with an inner/outer double rotational armatures-type power generation mechanism provided with an outer rotational armature and an inner rotational armature opposing the outer rotational armature and rotatable in a direction opposite of the outer rotational armature, and a pair of propellers disposed coaxially with blades of each of the pairs of propellers twists in opposite directions relative to an extending direction of a central axis of the pair of propellers, and a casing for accommodating and shielding the inner/outer double rotational armatures-type power generation mechanism. The submersible power generator, as installed under water to operate in a current, has a buoyancy F acting thereon that is larger than gravity W acting thereon during operation of the submersible power generator due to gravity acting on the mooring wire, so that F>W+gravity acting on the mooring wire−buoyancy acting on the mooring wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYOWA ENGINEERING CONSULTANTS CO LTDTOKYO 151-0073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kanemoto, Toshiaki Fukuoka, JP 4 7
Samura, Isao Tokyo, JP 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00