Catalyst module, receiving unit for such a catalyst module and method for manufacturing such a catalyst module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9803531
APP PUB NO 20150240691A1
SERIAL NO

14633298

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The catalyst module is designed for use in an emission control system of an industrial scale combustion system. It comprises a stack frame, in which several mounting units, especially element boxes are inserted. Each of these is provided with several catalysts. In order to make a simple installation possible and, at the same time, a reliable sealing, the stack frame is assembled from side frame parts, which are connected and especially bolted to one another via mechanical connecting elements, a sealing element, which is inserted during the installation before the connection of the at least one side frame part and pressed against at least one element box with the help of the connecting element, being present at least at a side frame part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JOHNSON MATTHEY CATALYSTS (GERMANY) GMBH96257 REDWITZ AN DER RODACH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kleuderlein, Robert Altenkunstadt, DE 5 14
Klumpp, Udo Marktgraitz, DE 5 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00