Method and apparatus for controlling swing body of construction equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9493927
APP PUB NO 20150240449A1
SERIAL NO

14630161

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Exemplary embodiments relate to controlling a swing body of construction equipment. Disclosed methods may include selecting a representative signal vs. speed curve, receiving an operating signal value from the operating input device, obtaining a reference speed value by applying said operating signal value to the selected curve, transmitting a command for rotational speed equivalent to said reference speed to the swing motor making the swing body rotate, obtaining rotational speed of said motor, determining whether a value obtained by subtracting rotational speed from reference speed exceeds the maximum permissible errors, obtaining a new signal vs. speed curve equivalent to rotational speed when a value obtained by subtracting rotational speed from reference speed exceeds the maximum permissible errors, obtaining a new reference speed value from an operating signal value using said new curve, and transmitting a new command for rotational speed equivalent to said new reference speed to said motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTDINCHEON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Sung Woo Seoul, KR 55 663
Park, Cheol Gyu Seoul, KR 2 8
Yoo, Seung Jin Seoul, KR 19 357

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00