Footer, footer elements, and buildings, and methods of forming same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9447557
SERIAL NO

14626817

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Footer products, and footers made with such products. Such product includes an insulating member between its upper and lower surfaces. The upper surface receives a load. The interior transfers the load from the upper surface to the lower surface, and distributes the load laterally and longitudinally such that the load received at the lower surface is within the load-bearing capacity of underlying soil. The product provides a thermal shock barrier between underlying soil and the interior of the building. The insulating member can comprise the entirety of the product, or can be combined with top and/or bottom load distributing layers, or can be combined with intercostals which extend top-to-bottom through the foam. Such footers are useful in constructing structures which use footers to spread the overlying load onto a greater surface area of the underlying soil than the cross-section area of the structure which presents the load to the footer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMPOSITE PANEL SYSTEMS LLC141 SOUTH WILLOW STREET EAGLE RIVER WI 54521

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schiffmann, Glenn P St. Germain, US 24 305
Wojtusik, Daniel J Eagle River, US 8 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00