Dry grind ethanol production process and system with front end milling method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9689003
APP PUB NO 20150240266A1
SERIAL NO

14690509

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dry grind ethanol production process and system with front end milling method is provided for improving alcohol and/or by-product yields, such as oil and/or protein yields. In one example, the process includes grinding corn kernels into particles then mixing the corn particles with a liquid to produce a slurry including oil, protein, starch, fiber, germ, and grit. Thereafter, the slurry is subjected to a front end milling method, which includes separating the slurry into a solids portion, including fiber, grit, and germ, and a liquid portion, including oil, protein, and starch, then milling the separated solids portion to reduce the size of the germ and grit and release bound starch, oil, and protein from the solids portion. The starch is converted to sugar, and alcohol is produced therefrom then recovered. Also, the fiber can be separated and recovered. Oil and protein may be separated and recovered as well.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEE TECH LLCSAN JOSE CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Chie Ying San Jose, US 39 430

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00