Molten glass conveying equipment element, method for manufacturing molten glass conveying equipment element, glass manufacturing apparatus comprising molten glass conveying equipment element and method for manufacturing glass product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9446976
APP PUB NO 20150239765A1
SERIAL NO

14707719

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a molten glass conveying equipment element. The molten glass conveying equipment element has a conduit structure for molten glass containing at least one conduit comprising platinum or a platinum alloy, a first ceramic structure provided around the conduit and a second ceramic structure located around the first ceramic structure. The method includes filling a gap between the conduit and the second ceramic structure with a slurry body, and sintering the slurry body at a temperature of 1,300 to 1,550° C., thereby forming the first ceramic structure. The slurry body is prepared by blending specific first particles, specific second particles and specific third particles with specific mass ratios.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGC INC5-1 MARUNOUCHI 1-CHOME CHIYODA-KU TOKYO 1008405 ?1008405

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hori, Keiji Tokyo, JP 3 2
Igarashi, Hitoshi Tokyo, JP 118 760
Niwa, Akifumi Tokyo, JP 8 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00