Vehicle power supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855905
SERIAL NO

14429360

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first power storage portion stores power generated by a generator in a vehicle, and supplies power to a motor for starting an engine and an electric device in the vehicle. A second power storage portion is connected to the first power storage portion in parallel, and stores power generated by the generator, and supplies power to the electric device in the vehicle. The first power storage portion and the second power storage portion are connected each other in parallel. A first switch is inserted in a path between the first power storage portion and the second power storage portion. A diode is connected in parallel with the first switch such that a cathode side thereof is connected to the second power storage portion side. A second switch is provided between the path and the second power storage portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANYO ELECTRIC CO LTDDAITO-SHI OSAKA 574-8534

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakajima, Kaoru Hyogo, JP 31 926
Ohsumi, Nobuyuki Hyogo, JP 10 108
Sakata, Hideki Hyogo, JP 30 292
Tsunesada, Akinobu Hyogo, JP 8 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00