Pneumatic tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9956829
SERIAL NO

14613036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pneumatic tire 1 is provided in a bead portion 4 with a bead core 5 formed of a bead wire 20. The bead core 5 has a wound single bead wire structure formed from turns of the single bead wire 20, and has at least three wire layers 10. Each side face of the bead core 5 has a shape such that it is possible to draw a common tangent 30 to at least two turns of the bead wire 20 appearing in the side face 51 which common tangent is substantially parallel with the tire radial direction. The turns of the bead wire 21 in the 1st wire layer 11 are alternated with the turns of the bead wire 22 in the 2nd wire layer 12 disposed on the outside of the 1st wire layer 11. The 1st wire layer 11 includes a turn 21 having the winding-start end 16 of the bead wire, which turn 21 is positioned between adjacent two turns 22 of the bead wire in the 2nd wire layer 12.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RUBBER INDUSTRIES LTDKOBE-SHI HYOGO 651-0072

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakamoto, Masayuki Kobe, JP 77 480
Ueda, Kenji Kobe, JP 289 3182

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00