Systems and methods for controlling manufacturing processes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9833962
SERIAL NO

14190711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a method for controlling a manufacturing process can include obstructing a part receiving path of a press station with a part detection fixture. The part detection fixture can include a moveable contact member and a target body that moves in response to motion of the moveable contact member. The moveable contact member of the part detection fixture can obstruct the part receiving path such that the target body of the part detection fixture is positioned in a dissenting state. The target body of the part detection fixture can be positioned in an assenting state coincident with contact between the moveable contact member of the part detection fixture and the workpiece. Image data of the target body of the part detection fixture can be detected with a vision system. The press station can be actuated when the image data is indicative of the assenting state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA MOTOR ENGINEERING & MANUFACTURING NORTH AMERICA INC6565 HEADQUARTERS DRIVE W1-3C PLANO TX 75024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Charles, Thoney R Georgetown, US 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00