Integrated process delivery at wellsite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12102970
APP PUB NO 20150238914A1
SERIAL NO

14709798

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixing unit comprising a frame, a rheology control portion, and a high-volume solids blending portion. The rheology control portion comprises means for receiving a first material from a first transfer mechanism, a dispersing/mixing system connected with the frame, and a first metering system to meter the first material from the first material receiving means to the dispersing/mixing system. The dispersing/mixing system disperses/mixes the metered first material with a fluid to form a first fluid mixture. The high-volume solids blending portion comprises means for receiving a second material from a second transfer mechanism, a solids blending system connected with the frame, and a second metering system to meter the second material from the second material receiving means to the solids blending system. The solids blending system blends the metered second material with the first fluid mixture to form a second fluid mixture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHLUMBERGER TECHNOLOGY CORPORATION300 SCHLUMBERGER DRIVE SUGAR LAND TX 77478

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coquilleau, Laurent Yves Claude Houston, US 3 20
Huey, William Troy San Antonio, US 33 1891
Luharuka, Rajesh Katy, US 49 2061
Morrison, Nikki Houston, US 5 148
Pham, Hau Nguyen-Phuc Houston, US 39 500
Ramesh, Avinash Houston, US 13 99
Shen, Christopher Todd Houston, US 8 53
Sridhar, Garud Bindiganavale Sugar Land, US 15 231

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00