Layered and spinel lithium titanates and processes for preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9825292
SERIAL NO

14434834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing lithium titanate which includes the steps of synthesizing a lithium titanate hydrate intermediate via aqueous chemical processing, and thermally treating the lithium titanate hydrate intermediate to produce the lithium titanate. The lithium titanate hydrate is preferably (Li1.81H0.19)Ti2O<<2H2O. The lithium titanate is preferably Li4Ti5O12 (LTO). Synthesizing the lithium titanate hydrate intermediate may include mixing a titanium-containing compound with a lithium-containing compound in a solvent to produce a lithium-titanium precursor mixture. Preferably the titanium-containing compound includes titanium tetrachloride TiCl4. Also, a lithium titanate obtained according to the process and a lithium battery including the lithium titanate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCGILL UNIVERSITYMONTREAL QC H3A 2T5
HYDRO-QUEBEC75 RENÉ-LÉVESQUE OUEST MONTRÉAL H2Z 1A4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiu, Hsien-Chieh Montreal, CA 3 6
Demopoulos, George Outremont, CA 3 4
Guerfi, Abdelbast Brossard, CA 109 691
Zaghib, Karim Longueuil, CA 180 871

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00