Nonaqueous electrolyte secondary battery and battery module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9257693
SERIAL NO

14700441

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nonaqueous electrolyte secondary battery, having an internal resistance of 10 mΩ or less as an alternating-current impedance value of 1 kHz, comprises a metal outer container, a nonaqueous electrolyte contained in the container, a positive electrode contained in the container, a negative electrode contained in the container, a separator interposed between the negative electrode and the positive electrode, a negative electrode lead having one end connected to the negative electrode, and a negative electrode terminal attached to the outer container so as to be connected electrically to the other end of the negative electrode lead, at least the surface of the negative electrode terminal which is connected to the negative electrode lead being formed of aluminum alloy with an aluminum purity of less than 99 wt. % containing at least one metal selected from the group consisting of Mg, Cr, Mn, Cu, Si, Fe and Ni.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBA1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-0023

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inagaki, Hiroki Kawasaki, JP 258 3627
Takami, Norio Yokohama, JP 499 5537
Tatebayashi, Yoshinao Yokohama, JP 48 1086

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00