Method and system to volumetrically control additive pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714741
SERIAL NO

14185180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chemical/additive injection controller, system and method (i.e., utilities) are provided that control when an injection pump turns on and off in order to inject a predetermined volume of additives into a hydrocarbon production conduit over a predetermined number of cycles per day. The controller determines when to activate and deactivate (i.e., turn on and turn off) an injection pump to provide a desired total additive injection volume over an injection period (e.g. 24 hours). More specifically, the utilities incorporate a flow meter that monitors the actual amount of additive that is injected during a pump cycle. Once an injected volume meets or exceeds a target injection volume the pump is deactivated. The flow meter continues to monitor the injection volume including amounts injected after power to the pump is deactivated to provide an accurate measure of the total injection. Subsequent injections are varied based on the actual measured volume of one or more previous injections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PCS FERGUSON, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sandidge, Dustin Levi Grand Junction, US 2 57

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00