Power integrated system and method for drilling rig and oil/gas production equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10018044
SERIAL NO

14614705

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power integrated system includes a gas storage unit, a gas driven generator, a power bus, a drilling rig, oil/gas production equipment, and a gas reformer. The gas storage unit is used for storing natural gas. The gas driven generator is used for generating electric power based on the stored natural gas. The power bus is used for receiving the electric power generated by the gas driven generator. The drilling rig is used for being driven by the electric power from the power bus. The oil/gas production equipment is used for being driven by the electric power from the power bus and for generating associated gas. The gas reformer is used for reforming the associated gas and supplying the reformed gas to the gas storage unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AI ALPINE US BIDCO INCCORPORATE TRUST CENTER 1209 ORANGE STREET WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Lishun Shanghai, CN 18 58
Ren, Zhiguo Shanghai, CN 14 12
Su, Ming Shanghai, CN 44 438
Sun, Fengcheng Shanghai, CN 11 126
Xue, Junli Shanghai, CN 11 18
Zhang, Jie Shanghai, CN 1052 8750

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00