Full displacement pile tip and method for use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9469959
APP PUB NO 20150233075A1
SERIAL NO

14184115

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The device is a Full Displacement Pile Tip (FDPT) with a sacrificial drill bit that is connected to a steel pipe, where the tip comprises at least four flanges or fish tails at the cutting edge extending from a conical, dome-like bottom, and integrally connected to the cutting teeth along the tip's axial shaft. The purpose of the FDPT is allow a steel pier to be screwed into the ground to serve as a foundation for a structure. This is a single operation where the FDPT and pipe remain in the ground. There is no removal of FDPT, minimal pouring of concrete, and there is minimal soil spoilage. A smaller drilling rig can be employed to save operating costs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAGGIO MICHAELSAN DIMAS CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maggio, Michael Azusa, US 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00