Method for producing a micromechanical component, and micromechanical component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9365410
APP PUB NO 20150232323A1
SERIAL NO

14624071

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a micromechanical component, and a micromechanical component, includes providing a substrate having first and second outer surfaces, the second surface facing away from the first surface; forming a through-hole through the substrate from the first outer surface up to the second outer surface; attaching an optical functional layer, on the second outer surface, to cover the through-hole; removing a first segment of the substrate on the first surface of the substrate so that there arises a third outer surface inclined relative to the second surface, the third surface facing away from the second surface, the inclined surface enclosing the through-hole; and separating the micromechanical component by separating a first part of the substrate, having the through-hole, and a second part, attached to the first part, of the optical functional layer from a remaining part of the substrate and a remaining part of the optical functional layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBH70442 STUTTGART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haberer, Dietmar Reutlingen, DE 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00