Grindstone tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10071465
APP PUB NO 20150231764A1
SERIAL NO

14424960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A grindstone tool is provided with a shaft part which has a tubular shape having a connection hole therein, a head part which has a cylindrical shape coaxially and integrally connected to the leading end of the shaft part and having a hollow section therein, and abrasive grains which adhere to the entire outer peripheral surface of the head part via a bonding material. A grinding fluid is supplied to the hollow section of the head part from one end side of the head part, the other end side of the head part is blocked by a lid member, and in the head part, a plurality of communication holes through which the hollow section and the outer peripheral surface communicate with each other, and which each have a taper shape with a diameter size on the outer peripheral surface side larger than a diameter size of the shaft center side are formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES MACHINE TOOL CO LTD130 ROKUJIZO RITTO-SHI SHIGA 520-3080

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arisawa, Hideaki Tokyo, JP 5 4
Niitani, Haruhiko Tokyo, JP 17 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 11, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 11, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00