Method and an installation for cutting up a mass of reinforced concrete

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10214965
APP PUB NO 20150226006A1
SERIAL NO

14620450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are examples of methods and systems for cutting up a reinforced concrete mass, in which a drilling tool is provided. In various embodiments, the drilling tool comprises: a drill tube carrying a cutter member; a device for causing the drill tube to vibrate, the device comprising a vibration generator for generating longitudinal vibration in the drill tube; a device for injecting a drilling fluid at the distal end of the drill tube; and a device for moving the drill tube along its longitudinal direction. In the disclosed methods and systems, the reinforced concrete mass is cut up by drilling at least one hole with the help of the drill tool by causing the drill tube to vibrate while injecting the drilling fluid into the mass from the distal end of the drill tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLETANCHE FREYSSINET92500 RUEIL MALMAISON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Binon, Stephane Rueil Malmaison, FR 2 2
Connesson, Micael Rueil Malmaison, FR 1 1
Guillon, Christophe Rueil Malmaison, FR 17 14
Termens, Florian Rueil Malmaison, FR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 26, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 26, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00