Copper alloy and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10017840
SERIAL NO

14694038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A copper alloy of the present invention contains 5.00 to 8.00 atomic percent of Zr and includes Cu and a Cu—Zr compound, and two phases of the Cu and the Cu—Zr compound form a mosaic-like structure which includes no eutectic phase and in which when viewed in cross section, crystals having a size of 10 μm or less are dispersed. This copper alloy is formed by a manufacturing method including a sintering step of performing spark plasma sintering on a Cu—Zr binary system alloy powder at a temperature of 0.9 Tm ° C. or less (Tm(° C.): melting point of the alloy powder) by supply of direct-currant pulse electricity, the Cu—Zr binary system alloy powder having an average grain diameter of 30 μm or less and a hypoeutectic composition which contains 5.00 to 8.00 atomic percent of Zr. The Cu—Zr compound may include at least one of Cu5Zr, Cu9Zr2, and Cu8Zr3.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NGK INSULATORS LTD2-56 SUDA-CHO MIZUHO-KU NAGOYA-CITY AICHI-PREFECTURE 467-8530
TOHOKU UNIVERSITYSENDAI-SHI MIYAGI 980-8577

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goto, Takashi Sendai, JP 200 1735
Inoue, Akihisa Sendai, JP 197 2954
Kimura, Hisamichi Iwanuma, JP 31 264
Muramatsu, Naokuni Nagoya, JP 42 208

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 10, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 10, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00