Tool changeover system and method as well as roll

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9975159
SERIAL NO

14618166

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To minimize the setup times in the case of a tool changeover on rolls, the movement sequences are separated into transverse movements and vertical movements using a tool changeover system and method for changeover of at least one tool disposed on a roll shaft in a working position. In one aspect, the tool changeover system includes a tool changeover rack, a vertical transport and a transverse transport. A drawing frame separate from the tool changeover rack can be transported transversely separately with reference to the tool changeover rack. The tool changeover rack has a device for connecting with the vertical transport and a tool accommodation for accommodating the tool. The drawing frame has a device for connecting with the transverse transport and a device for connecting with the tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMS GROUP GMBH41069 MÖNCHENGLADBACH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bieniek, Juergen Moenchengladbach, DE 2 0
Rode, Ralf Moenchengladbach, DE 5 12
Schaprian, Markus Moenchengladbach, DE 7 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00