Power supply system and method for controlling power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9716504
APP PUB NO 20150207512A1
SERIAL NO

14421234

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power control device 9 of the present invention includes: a power-supply target value obtaining unit 21 configured to obtain electric power being currently consumed by a load as a power-supply target value; a generated-power detection unit 22 configured to detect a generated-power value generated by a fuel cell 2 with respect to the power-supply target value; a power compensation amount calculation unit 23 configured to calculate a deviation of the generated-power value from the power-supply target value and determine an amount of power compensation to be supplied to the load from a storage cell 6; and an output power control unit 24 configured to determine current transient response characteristics of the storage cell 6, and perform control so that output power from the storage cell 6 becomes equal to the amount of power compensation based on the current transient response characteristics.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSAN MOTOR CO LTDJAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Takeshi Hayama-machi, JP 268 3417

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00