Power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9866022
SERIAL NO

14402255

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When an AC line of one local system and a power system are in a parallel-off state, a control device included in a power supply system causes local inverter devices of the local systems to operate in a parallel-off operation mode in which control is performed such that the voltage and frequency of power on the AC line is at a target voltage and a target frequency determined according to the state of charge of a power storage device. When a condition for switching to the connected state has been satisfied, the control device stops operation of the local inverter device in the parallel-off operation mode and causes a switch to the connected state by operating the interrupting device, and thereafter causes the local inverter device to operate in a charging operation mode used in charging the power storage device with supplementary power received from the power system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSAKA GAS CO LTD1-2 HIRANOMACHI 4-CHOME CHUO-KU OSAKA OSAKA-SHI 5410046
WIND ENGINEERING CENTER CO LTD8-7 SUMIDA 4-CHOME SUMIDA-KU TOKYO 1310031

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirai, Tomoyuki Osaka, JP 10 68
Nagata, Satoshi Tokyo, JP 1999 10920
Nakao, Kunihiro Osaka, JP 2 8
Yakire, Koji Osaka, JP 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00