Method for treating organic waste, in particular sludge from wastewater treatment plants, and facility for implementing said method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850155
SERIAL NO

14409043

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for treating organic waste, in particular to a method for treating sludge from wastewater treatment plants, in order to produce power and/or hygienized organic matter, including a first step of mesophilic or thermophilic digestion (13) of at least one fraction of a stream of organic waste, and comprising the following steps: dehydrating (15) all of the digested and non-digested waste; aerated thermal hydrolysis (16) of the dehydrated waste, including an injection of an oxidizing agent in a quantity lower than the stoichiometric quantity for oxidizing organic matter, and setting to the required temperature by a heating means; and a second mesophilic or thermophilic digestion (17) of the stream of hydrolyzed waste.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEGREMONT183 AVENUE DU 18 JUIN 1940 92508 RUEIL MALMAISON

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pardo, Pierre-Emmanuel Orsay, FR 8 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00