Electromagnetic energy-initiated plasma reactor systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9908095
SERIAL NO

14415294

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of processing a reaction product generated from a plasma-based reactive process includes: supplying a first electromagnetic energy to a flowing primary gaseous feed material, such that at least a fraction of the flowing primary gaseous feed material is excited by the supplied first electromagnetic energy into a first plasma within a first plasma zone, and such that at least a fraction of the flowing primary gaseous feed material is converted to a first plasma zone-conditioned product while flowing through the first plasma and the first plasma zone-conditioned product is flowed to a downstream reaction zone. A second gaseous material is then introduced to the downstream reaction zone. The first plasma zone-conditioned product is contacted with the second gaseous material within the downstream reaction zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ATLANTIC HYDROGEN INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tranquilla, James New Brunswick, CA 7 370

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00