Spectacle lens and method for making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10663764
APP PUB NO 20150153589A1
SERIAL NO

14557252

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a spectacle lens includes the steps of providing an integral main lens. The integral main lens has a front surface and a back surface and is at least one selected from a group consisting of a spherical power lens, an astigmatic power lens, and a lens having a main curvature of the front surface in a first meridian and a main curvature of the back surface in the first meridian which are different so as to provide for a spherical power different from zero; and applying at least one additional lens element to at least a part of the front surface and/or at least a part of the back surface, wherein the at least one additional lens element includes at least one layer having a multitude of layer elements, in particular printed layer elements. Further, the invention is directed to a corresponding spectacle lens.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARL ZEISS VISION AUSTRALIA HOLDINGS LTDLONSDALE SA 5160

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Begley, Paraic Waterford, IE 5 46
Brown, Stephen Adelaide, AU 145 2243
Kratzer, Timo Aalen, DE 43 402
Meschenmoser, Ralf Essingen, DE 26 99

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00