Method for controlling a mineral material processing plant and a mineral material processing plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10730056
APP PUB NO 20150122921A1
SERIAL NO

14405952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mineral material processing plant and a method for controlling thereof. The processing plant includes at least one motor, at least one actuator, a control and adjusting system, a switch for switching the processing plant to a standby mode and an arrangement for keeping selected actuators in operation with a reduced standby speed. In the method, a command is given to the processing plant to switch to the standby mode and in response to the command to switch to the standby mode, feeding of mineral material to the processing plant is limited and speed of the motor or motors of the processing plant is reduced from the processing speed (Rf) to a reduced standby speed (Rsb) and it is ensured that selected actuators of the processing plant remain operating with a reduced speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METSO OUTOTEC FINLAND OYLOKOMONKATU 3 TAMPERE 33900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jokiranta, Mikko Pori, FI 1 1
Maunula, Erno Toijala, FI 1 1
Rantanen, Jukka-Pekka Tampere, FI 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00